DPM 2010 disaster scenario

    Question

  • So we had massive san failures.

    I had DPM syncing every hour but only a recovery point late at night.

    It synced right before we went down with all of our servers, however i only have recovery points from the day before.

    The DPM box was unplugged from the network before the server came back on line with corruption. 

    So the last syncs are good. However trying to create a recovery point from the last sync are failing......

    HELP!

    thank you...

    JustusIV

    Friday, March 09, 2012 4:31 PM

All replies

  • Hi,

    when you say that creating from the latest sync is failing. What error is showing in DPM console?

    Friday, March 09, 2012 5:19 PM
  • So i go to the protection tab and go the the bare metal and say create recovery point. And it attempts to resync but that fails let me run to the server and get the message.
    Friday, March 09, 2012 5:24 PM
  • Recovery point creation jobs for volume c:\ on Server.forest.org have been failing. The number of failed recovery point creation jobs =1 

    If the datasource protected is sharepoint, then click on the error details to view the list of databases for which recovery point creation failed.

    ID 3114

    And that is from going to the bare metal and clicking create recovery.

    Friday, March 09, 2012 5:30 PM