Hi,
I have a DPM 2010, where I sometime get: The job was cancelled. The user either cancelled the job or modified the associated protection group.
I know for sure, that the protection group have not been modified.
Could this happen, becasue someone runs a recovery while the consistence check/recovery point is running?
/Peter