Exchange 2010 DAG Backup through DPM 2010 - Multiple Jobs for Database Backup
-
Monday, April 23, 2012 11:29 AM
Hi All,
We have an Exchange 2010 Environment with DPM 2010 Backup solution. We have three Mailbox Servers in our Environment.
I have created One protection Group for all three Mailbox Servers database backup. I configured only passive database copies to take the backup.
Every day, we taking the Incremental Backup via 24 hours sync frequency.
When the backup starts at 12 AM, Only three database backups are running at a time. Rest of the jobs are in pending state. But we need to run multiple jobs at time through schdule.
Is ther any way, we can configure PG to run multiple jobs at a time for the Mailbox Server Backup ?
Regards
Manoj
- Edited by Manojkumar V Monday, April 23, 2012 12:28 PM
All Replies
-
Friday, April 27, 2012 6:19 AM
Hi All,
Any Idea ?
Regards
-
Monday, May 14, 2012 2:12 PM
Hi,
You should considered to create more than one PG to run multiple jobs at same time.
Example:
PG01 => MailboxServer01 / database01_02_03...
PG02 => MailboxServer02 / database01_02_03...
PG03 => MailboxServer03 / database01_02_03...
There is no way inside one PG to have more than 3 backups running simultaneously for Echange 2010 Database.
Stéphane.
- Marked As Answer by Yegor StartsevMVP, Moderator Friday, April 05, 2013 9:08 AM

