질문 Exchange 2010 move to Virtual

  • 2012년 6월 27일 수요일 오전 9:59
     
     

    hi all,

    i have Exchange 2010 installed on the following servers

    2 DAG mailbox servers

    1 CAS/HUB server

    1 Exchange 2007 Edg server

    i want to create new virtual servers and move all my environment to it what is the steps to do that and can i upgrade my edge to 2010 ?

    Thanks


    Tarek Khairy

모든 응답

  • 2012년 6월 27일 수요일 오전 11:25
     
     

    Migration is the answer...

    Cheers,


    Gulab Prasad,
    gulab@exchangeranger.com
    My Blog | Z-Hire Employee Provisioning App

  • 2012년 6월 27일 수요일 오후 12:06
     
     

    Migration for what Edge  only ?

    and for the other roles what shall i do? install the roles on the VM's with new names and IP addresses ?

    Thanks


    Tarek Khairy

  • 2012년 6월 27일 수요일 오후 12:45
     
     

    NO, all the roles, Mailbox, HT, CAS and EDGE...


    Gulab Prasad,
    gulab@exchangeranger.com
    My Blog | Z-Hire Employee Provisioning App

  • 2012년 6월 27일 수요일 오후 5:30
     
     

    If you're thinking of virtualizing via Hyper-V review the following.

    http://www.gsx.com/blog/bid/76411/Exchange-2010-and-Hyper-V

  • 2012년 6월 28일 목요일 오전 7:20
     
     

    Hi,

    We recommend the following order when installing the Exchange 2010 server roles:

    1. Client Access server role
    2. Hub Transport server role
    3. Mailbox server role
    4. Unified Messaging (UM) server role
    5. Edge Transport server role

    So for edge transport server role, please add it to the current orgnization and then subscribe your Exchange 2010 Edge Transport server to your site.

    After that, you can remove Edge 2007 server.

    Upgrade from Exchange 2007 Transport

    http://technet.microsoft.com/en-us/library/dd346708.aspx


    Xiu Zhang

    TechNet Community Support

  • 2012년 6월 28일 목요일 오전 8:36
     
     

    thanks for the reply , i will follow the steps as above but my question what i need to do is to configure the new mailbox servers in the same DAG or create anew one as i want to create new DB's and move the mailboxes to it?

    and i want to make CAS array with NLB.

    Thanks


    Tarek Khairy

  • 2012년 6월 29일 금요일 오전 6:25
     
     

    Hi,

    You may need to create new mailbox server and then move mailbox to the new database.

    Do not add this server to DAG. I think we can create DAG after the migration.

    Besides, please understand that if we have have mailbox role installed together with CAS role, and we have made DAG with that mailbox server, then we cannot create CAS array together with DAG, since we cannot have windows load balance intalled with windows cluster, that is unsupported.


    Xiu Zhang

    TechNet Community Support

  • 2012년 6월 30일 토요일 오전 6:59
     
     

    thanks for the reply, so u think i deploy one mailbox server stand alone create the DB's move mailboxes to the DB's then depoly another mailbox server and create the DAG then decomission old mailbox servers?

    what about the CAS server?


    Tarek Khairy

  • 2012년 7월 2일 월요일 오전 6:27
     
     

    Hi,

    We need create CAS and hub role first. Do not install CAS and hub role together with mailbox server role.


    Xiu Zhang

    TechNet Community Support