Cube Building error in epm 2007. RRS feed

  • Question

  • Hi All,

    I am trying to configure the cube in epm 2007 and getting this error..

    Failed to build the OLAP cubes. Error: Analysis Services session failed with the following error: Failed to process the Analysis Services database ProjectAnalysis on the povsltrepmdb server. Error: Errors in the OLAP storage engine: The linked measure group with the ID of 'EPM Timesheet', Name of 'EPM Timesheet' cannot be processed because it contains MG dimension with the ID of 'Resource Is Active', Name of 'Resource Is Active' with different granularity attribute than its source object. Server: The operation has been cancelled.

    Please suggest.


    sandeep

    Friday, March 16, 2012 10:04 AM