  • Hi,

    I'm new to AppV so forgive me if this is a dumb question.  I have sequenced several programs, and can successfully advertise and deploy them with SCCM 2007 R3.

    What I would like to do now, is deploy all of my apps during an OSD Task Sequence.  The catch is, I need the applications to end up pre-cached (download and execute I believe it is called).  I have followed the following instructions

    http://technet.microsoft.com/en-us/library/cc431389.aspx

    The applications are successfully registered on the machine, but it looks like they are streaming from the DP, and not just running from cache. During the OSD, a 1.5 GB virtual app is taking only 1 second to successfully complete the task. 

    When the OSD completed, I unplugged the ethernet cable to simulate being offsite.  Any attempts to run these apps results in "An Application Distribution Point is Not Available".  Once I plug the cable back in, they run beautifully.

    Is there a way to force the app to be pre-cached during an OSD Task Sequence.