none
Map Additional Fields from Enterprise Project to Project Site RRS feed

  • Question

  • Hello,

    I'm trying to create a summary view on a project site to show certain milestone tasks on the home page. I'm able to create this view in the main Project Detail Pages interface of PWA by filtering my project to Milestone=Yes and WBS begins with X.X, but I'm not able to recreate this filter in my project site because the Milestone and WBS fields are not passed down in the task list. I've found how to do this if the project were a sharepoint list, however is there a way to map additional fields to a project site that's tied to an enterprise project? If so, is it possible to set this as a default so all sites receive these fields?

    Is there another/better way to do this? Should I be using reports or another interface instead of the tasks list? I've looked into using Power BI however it isn't possible to pass filters to embedded reports so it would not show the data for a specific project on each site by default.

    Thanks,
    David

    Tuesday, April 2, 2019 4:53 PM

Answers