  • Hello,

    I have created a Project, there was a lengthy gap where the project was on hold, as a result the project extends to 250 days. My question is how do I present this Project without the huge gap? Currently, when I export to PDF, there are many blank pages due to the gap. 

    Thanks.

    Thursday, January 9, 2014 4:28 PM

All replies

  • Hi StealthProject,

    There is no easy way to do that. You could set the Gantt chart in the "view" tab of the ribbon to be displayed for the entire project.

    I suggest in the PDF page setup printing options to 

    • adjust to 1 page width, but doing this your gantt will look pretty small
    • or to uncheck the option "print blank pages"

    Hope this helps.


    Guillaume Rouyre - MBA, MCP, MCTS

    Thursday, January 9, 2014 4:36 PM
    Moderator
  • I'm assuming you are trying to export the Gantt chart graphic.  You may have luck using the Copy Picture command to take two pictures of the Gantt chart and then using a graphic program to stitch them back together.  For example, I use SnagIt and can take two pictures and combine them with jagged edges to show the split in time.