Controls for Project Server 2010 - Exchange task integration RRS feed

  • Question

  • I have recently configured Server 2010 and Exchange 2010 integration and there does not seem to be any controls for tweaking. Is there a control panel or configuration screen anywhere?

    For instance...

    • Can I filter certain tasks from flowing to Exchange based on a flag or date?
    • Can I prevent completed tasks from flowing to Exchange?
    • Can I turn off the ability to update a task status from the Outlook task window?
    • Can I configure frequency for syncs between Project Server and Exchange?
    • I also find I get tasks from generic resources in my Outlook task list even when I am not the project "owner".


    There does not seem to be much documentation for this integration either....

    Thursday, November 14, 2013 3:23 AM

All replies

  • Hi wsg2,

    There is no control panel, everything flows, and it flows "instantly".  For a more granular experience you might want to try a 3rd party tool - one such one is Allocatus.


    Ben Howard [MVP] <a href="http://www.applepark.co.uk/ben-howard-blog/">blog</a> | <a href="http://www.applepark.co.uk">web</a> | <a href="http://shop.oreilly.com/product/0790145369154.do">book</a>

    Thursday, November 14, 2013 7:04 AM
    Moderator