none
DPM not allowing multiple tape jobs to run simultaneously RRS feed

  • Question

  • I just want to check if there is something not set up correctly in the configuration of our SC DPM 2012 R2 tape library.

    We are running a HP LTO5 4 drive tape unit, however it seems to only be pushing through 1 drive at a time, even with simultaneous tasks running. However I can see the correct tapes in the drive for the simultaneous jobs that should be running.

    What should I check next?

     
    Friday, October 20, 2017 4:41 AM