I have a WSUS server running on server 2008 R2 with an external SQL 2008 DB.
I installed a new 2012 R2 server and installed WSUS which I want to use as a replica server before I decommission the 2008 server.
If I try to configure WSUS on 2012, it fails post-configuration tasks. Should I point the new server to the existing database before I configure WSUS?
What's the best way to migrate?
Thanks