    Scenario: The PMs utilize Baseline 1 Work for selected tasks.  Recently, they noticed that the Baseline 1 work in those tasks is disappearing at the assignment level.  For example, after the task is baselined, Baseline 1 work at the Task level can be seen, as well as at the assignment level and the time phased view. Later on when the work plan is opened from the server, only the Baseline1 work at task level remains. All Baseline1 work at the assignment level disappears.

    All PMs have the same patch level installed.

    What else can we look at for a potential root cause?

    Wednesday, May 30, 2012 1:40 PM

All replies

  • It does sound kind of like a bug.  I did some research on baseline work and
     
    Maybe that may give you some ideas of places to examine?
     
     

    Andrew Lavinsky [MVP] Blog: http://azlav.umtblog.com Twitter: @alavinsky
    Thursday, May 31, 2012 1:24 PM
    Moderator
  • I have the same problem in Project Pro 2013/Project Server 2013 with the latest CU's installed on both client and server. 

    We have however migrated from 2010 to 2013...

    So please assist.

    Regards,

    Philip


    Verlinden Philip

    Wednesday, October 15, 2014 2:08 PM
  • Hi Philip,

    Can you reproduce this issue with a brand new 2013 file (versus migrated file from 2010)?


    Hope this helps,


    Guillaume Rouyre, MBA, MVP, MCP |

    Wednesday, October 15, 2014 2:15 PM
    Moderator
  • Hi Guillaume,

    The frustrating part is that I'm not able to reproduce the problem if the project does not have the problem.
    Once the problem is there, all baselines including new are infected...