locked
PerformancePoint 2010 Analytic Chart date config RRS feed

  • Question

  • I'm fairly new to PerformancePoint. 

    I would like a chart to show the last 90 days from the current date on the X axis.   Any tips on how to do this?   I can create the chart I want, but I'm having a difficult time figuring out how I make the X axis float with the date. 
    thx.
    Monday, February 22, 2010 6:01 PM

Answers