    I noticed an odd issue while examining overall %Complete of a project plan in PWA vs offline version of MS Project. Specifics of the scenario:

    • B.mpp is included as a sub-project, via a *Link to Project*, in A.mpp. This is how A.mpp is in PWA. (*Link to Project* where Project refers to B.mpp.)
    • I saved a copy of A.mpp and B.mpp on my laptop. In the local version I made a minor change where I explicitly included B.mpp as a sub-project (not as a link, i.e., "Link to Project" is unchecked). 

      The overall %complete of A.mpp in the offline version is significantly higher than the online version. I could not figure out how this changed.