locked
convert existing 2012 DP to a new secondary site RRS feed

  • Question

  • I have one specific environment where we have been running both CM2007 and CM2012 side by side.

    currently we migrated most of the objects but the CM2012 is not yet in production.

    we have already some DPs setup in the CM2012 as well (on new hardware)

    now I created the final design to change over to CM2012, I noticed that some of the existing DPs should be better of on a secondary site due to the number of clients remotely and the network bandwith availability between primary site and secondary.

    but I am afraid I need to create the secondary site(s) on a new remote server and then send the content again to that new server, or is there a way we could 'convert' the existing DP to a new secondary site without having to send the content again?

    thx for clarifying