Baseline dates save in MSP 2003 don't appear in MSP 2010 RRS feed

  • Question

  • Various baseline dates that were set when I was using MS Project 2003 appear to have been lost in MSP 2010. The date when it was baselined shows up in the set baseline dialogue box as (last saved on Tue x/x/xx) but doesn't have any data when the baseline column is shown.