  • Hi

    I am trying to setup up excel reports using project server 2013.  I have setup key dates with a unique identifier in the OutlineCode field to avoid mistyping / user editing.

    From a look in Project Server - Project And Task Data.odc the connection includes loads of project and task data but unfortunately doesn't include the outlinecode field.  Can you edit the configuration of the odc file to include outlinecode or is the configuration limited to the data currently defined.

    If you can edit this, can anyone suggest how?

    Thanks

    Wills