I am creating a large document which has 30-40 linked Visio and Powerpoint files. I am building the document and linking the files 'locally'. My question is, when I load the document to Sharepoint, can I also upload all the linked files into
another Sharepoint directory and expect the links to be maintained? Or, do I have to load all the files to be linked into Sharepoint first, then load the document and then edit / check out the document and link all the files?
Thanks so much!