DPM 2012 R2 Job Queueing? RRS feed

  • Question

  • I am using DPM 2012 R2 for enterprise backups. The problem I am having is the method that DPM uses to start jobs. DPM is starting the most recently queued jobs over the previously queued. This leads to a long list of backups that are never being reached due to the size of some servers, and the time it can take to complete their backup. I was wondering if there was a way to change this method to start with the first job queued rather than the most recent?
    Wednesday, April 9, 2014 4:17 PM