Examples Requested for levelling order in Resource Levelling RRS feed

  • Question

  • Hi  Fellow PMs,

    i am trying to undersatnd the difference between the 2 options in levelling order in resource levelling options

    1. Standard

    2. Priority, Satndard.

    i have read literature online, however couldn't locate a single example!..

    can somebody please give me a simple example where the  leveling results are different based on which of the leveling order is chosen. In whatever i have  tried, both yield the same results!

    Regards,

    Lakshmi

    Wednesday, December 24, 2014 6:21 PM

Answers

  • Hi Lakshmi,

    Please refer to this excellent blog post on MPUG about resource leveling.

    The second option (priority, standard) will use the "priority" task field in order to choose with assignment should be prioritized versus the others. This allows you to mention that a particular task has a hight priority (between 0 and 1000, 500 by default) so it should be considered in the leveling.


    Hope this helps,


    Guillaume Rouyre, MBA, MVP, P-Seller |

    Wednesday, December 24, 2014 6:58 PM
    Moderator