none
Task sequence does not continue after step 53. RRS feed

  • Question

  • I created a Hyper-V virtual environment.
    The FBPLMDT machine where Workbench 6.3.8450 (Ram 6GB) is installed.
    FBPLOBRAZ machine, on which he tests image uploads (Ram 6GB).

    Due to the specificity of installed programs, I am forced to create a system image together with installed programs and system and profile settings.

    Problem 1
    When uploading has a master image machine, the process stops at step 53 of the Task Sequences. This is the moment when Task Seqence installed os.wim, made a reset and you can log in to the Administrator account on the screen.
    I have not done major Task Sequence edits yet, I rely on standard settings.

    After logging into the machine with the uploaded image, I have information that the default settings have been reset (the region is set to English). In the BDD file, I do not see any errors at the end. I have no idea what to stop Task Sequence.

    I do not have this problem when loading a clean Windows image.

    My question: where can I look for errors in the log to find the problem? I looked through a few logs on the C drive on a machine with a loaded image, but I could not find anything specific.

    It is my BDD.log

    https://send.firefox.com/download/9f56577787dc67e7/#KVstQmd8RwTIICgbdy1_Pg

    Please help

    Tuesday, May 28, 2019 10:31 AM