PowerBI Reports on Timesheets from PWA RRS feed

  • Question

  • Hi All,

    I have timesheets being used on PWA for all my resources. I was hoping to utilise PowerBI to run reports on this (eg, time worked on projects vs admin time, filtering out by different project types etc). With the out-of-the-box reporting in PowerBI that links to PWA, it doesn't seem to have any inbuilt fields/filters. Anyone done this before and able to point me in the right direction?

    If it requires an OData Feed, that seems to block my permissions, so a guide on how to set that connection up would be useful as well! I am on PowerBI desktop, which is connected up to my O365 account accessing the pwa site at https://SITENAME.sharepoint.com/sites/pwa

    I have 100% permissions on everything i can see!


    Ilai S :)

    Tuesday, May 7, 2019 10:00 AM