Managing Resource Cost Rate Tables in OData RRS feed

  • 질문

  • The ProjectData API doesn't expose the cost rate tables for a resource. Is it possible to update Cost Rate "A" and specify effective dates? I don't see this exposed in the API. Only the standard and overtime rates (of "A" which is the default) are exposed.  Anyone know if this simply isn't possible?
    2014년 10월 29일 수요일 오후 3:53

답변

  • Hi Roland,

    As per this link and since the cost rate table is local (in the mpp), you cannot use PSI to update it. On the contrary, standard and overtime rates are enterprise data so exposed.


    Hope this helps,


    Guillaume Rouyre, MBA, MVP, P-Seller |

    • 답변으로 표시됨 Roland G29 2014년 10월 29일 수요일 오후 4:40
    2014년 10월 29일 수요일 오후 4:15
    중재자

모든 응답

  • Hi Roland,

    As per this link and since the cost rate table is local (in the mpp), you cannot use PSI to update it. On the contrary, standard and overtime rates are enterprise data so exposed.


    Hope this helps,


    Guillaume Rouyre, MBA, MVP, P-Seller |

    • 답변으로 표시됨 Roland G29 2014년 10월 29일 수요일 오후 4:40
    2014년 10월 29일 수요일 오후 4:15
    중재자
  • Thanks for the info Guillaume!
    2014년 10월 29일 수요일 오후 4:40