Managing Resource Cost Rate Tables in OData RRS feed

  • Soru

  • The ProjectData API doesn't expose the cost rate tables for a resource. Is it possible to update Cost Rate "A" and specify effective dates? I don't see this exposed in the API. Only the standard and overtime rates (of "A" which is the default) are exposed.  Anyone know if this simply isn't possible?
    29 Ekim 2014 Çarşamba 15:53

Yanıtlar

  • Hi Roland,

    As per this link and since the cost rate table is local (in the mpp), you cannot use PSI to update it. On the contrary, standard and overtime rates are enterprise data so exposed.


    Hope this helps,


    Guillaume Rouyre, MBA, MVP, P-Seller |

    • Yanıt Olarak İşaretleyen Roland G29 29 Ekim 2014 Çarşamba 16:40
    29 Ekim 2014 Çarşamba 16:15